Page not found

Search results

  1. Scott Valley Groundwater Advisory Committee Meeting

    Slides Meeting Slides Image Slideshow Display Contact Info Block Web Page Calendar Event Menu Settings ... October 12, 2023. 7. *Update on Strategy Document and 2024 Facilitation Support Activities (Marisa ... basin • Up to 76 m (250 ft) thick aquifer – Scott River flows from south to north • 12 major tributary ...

    12/06/2023 - 1:14pm

  2. Workshop on Efficient Water Management for Forage Crops

    Image Slideshow Display Contact Info Block Web Page Calendar Event Menu Settings Workshop on Efficient ... Zaccaria, UC Davis) 11:15 – 12:00 pm: Evaluating Irrigation System Performance at Field Level: Criteria, ... Kc  1.05- 1.10 from 2-3 days after irrigation till the next cutting APPLICATION RATE < < SOIL ...

    03/21/2024 - 3:43pm

  3. Applications and Permits

    Penalties for late payments- all annual fees are due within 30 days of the billing date. A cumulative 10% of ... Phone: Water Source: Other: Facility Name: Date: Entrance: 23: 23_1: 23_2: 23_3: Entrance_1: Entrance_2: ... PLEASE SCHEDULE AN APPOINTMENT 3- 5 WORKING DAYS IN ADVANCE OF YOUR INTENDED OPENING DATE. A HEALTH ...

    10/19/2023 - 2:21pm

  4. Archived Documents

    County: No entry. This field will auto-populate from the Information worksheet. Date: No entry. This field ... field will auto-populate from the Information worksheet. Date: No entry. This field will auto-populate ... navigate spreadsheet. County: No entry. This field will auto-populate from the Information worksheet. Date ...

    09/27/2023 - 11:50am

  5. Flood Control and Water Conservation District

    Signature____________________________________________________________________________________ Date Date The POST-EVENT field review of the event course took place ... application to the address listed below a minimum of two (2) months prior to the event date. Siskiyou County ... event. Instructions for Completing the Application for Special Event Permit • Identify the name, date ...

    11/22/2023 - 3:23pm

  6. Land Use

    and place for response and an opportunity to be heard within 10 days of the date of mailing. (c) ... camp on the property in absence of a permitted dwelling unit for more than 30 days per year and ... occupancy of more than 30 days per year constitutes a violation of Siskiyou County Code Section 3-17.01. ...

    09/18/2023 - 10:04am

  7. Sanitation

    of more than 2,000 individuals per day of operation of the event, at a location that includes, but is ... 41734.5, and 41780.01 and Chapter 12.8 (commencing with Section 42649) to Part 3 of Division 30 of, and ... added Chapter 12.9 (commencing with Section 42649.8) to Part 3 of Division 30 of the Public Resources ...

    12/01/2023 - 10:31am

  8. JH Ranch Project

    150 µg/m3-- 150 µg/m3 30 µg/m3 50 µg/m3 Sulfates 24 Hour---- 25 µg/m3 Lead 30 Day Calendar Qtr-- 1.5 ... is attained when the expected number of days per calendar year with a 24-hour average concentration ... Ranch History In 1970, JD Proctor filed a Use Permit application (UP-70-12) to establish the original JH ...

    11/21/2023 - 4:23pm

  9. Klamath Dam Decommissioning Project

    license and remove the four developments.12 On October 5, 2017, Commission staff requested additional ... at $450 million. Supporting documents, including the summary and most up-to-date reports are below.  ... Siskiyou Board Meeting Dates Lower Klamath Hydroelectric Decommissioning Project *dates subject to change* ...

    03/05/2024 - 3:29pm

  10. Housing Assistance Application

    Sep Oct Nov Dec edit-submitted-date-day Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 ... Jun Jul Aug Sep Oct Nov Dec edit-submitted-date-of-birth-day Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 ... 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 edit-submitted-eviction-date ...

    03/13/2024 - 3:13pm

Pages