Page not found

Search results

  1. Scott Valley Groundwater Advisory Committee Meeting

    Slides Meeting Slides Image Slideshow Display Contact Info Block Web Page Calendar Event Menu Settings ... October 12, 2023. 7. *Update on Strategy Document and 2024 Facilitation Support Activities (Marisa ... basin • Up to 76 m (250 ft) thick aquifer – Scott River flows from south to north • 12 major tributary ...

    12/06/2023 - 1:14pm

  2. Workshop on Efficient Water Management for Forage Crops

    Image Slideshow Display Contact Info Block Web Page Calendar Event Menu Settings Workshop on Efficient ... Zaccaria, UC Davis) 11:15 – 12:00 pm: Evaluating Irrigation System Performance at Field Level: Criteria, ... Survey 2018, (DWR-UCD) Approximately 30% decline in field crops between 2006 and 2017 and increase in ...

    03/21/2024 - 3:43pm

  3. Applications and Permits

    Penalties for late payments- all annual fees are due within 30 days of the billing date. A cumulative 10% of ... the fee and must be made within one year of date period. 4) Returned check charge $24.00 C. Prorated ... PLEASE SCHEDULE AN APPOINTMENT 3- 5 WORKING DAYS IN ADVANCE OF YOUR INTENDED OPENING DATE. A HEALTH ...

    10/19/2023 - 2:21pm

  4. Sanitation

    of more than 2,000 individuals per day of operation of the event, at a location that includes, but is ... 41734.5, and 41780.01 and Chapter 12.8 (commencing with Section 42649) to Part 3 of Division 30 of, and ... added Chapter 12.9 (commencing with Section 42649.8) to Part 3 of Division 30 of the Public Resources ...

    12/01/2023 - 10:31am

  5. Archived Documents

    County: No entry. This field will auto-populate from the Information worksheet. Date: No entry. This field ... $7,239.47 24 47 Day Reporting Center NON-FSP $1,470.00 $1,470.00 25 $0.00 26 $0.00 27 $0.00 28 $0.00 29 ... field will auto-populate from the Information worksheet. Date: No entry. This field will auto-populate ...

    09/27/2023 - 11:50am

  6. Land Use

    and place for response and an opportunity to be heard within 10 days of the date of mailing. (c) ... camp on the property in absence of a permitted dwelling unit for more than 30 days per year and ... occupancy of more than 30 days per year constitutes a violation of Siskiyou County Code Section 3-17.01. ...

    09/18/2023 - 10:04am

  7. Flood Control and Water Conservation District

    Signature____________________________________________________________________________________ Date Date The POST-EVENT field review of the event course took place ... application to the address listed below a minimum of two (2) months prior to the event date. Siskiyou County ... event. Instructions for Completing the Application for Special Event Permit • Identify the name, date ...

    11/22/2023 - 3:23pm

  8. JH Ranch Project

    150 µg/m3-- 150 µg/m3 30 µg/m3 50 µg/m3 Sulfates 24 Hour---- 25 µg/m3 Lead 30 Day Calendar Qtr-- 1.5 ... is attained when the expected number of days per calendar year with a 24-hour average concentration ... µg/m3 35.0 µg/m3 15.0 µg/m3 35.0 µg/m3 12 µg/m3-- Suspended Particulate Matter (PM10) Annual 24 Hour-- ...

    11/21/2023 - 4:23pm

  9. Klamath Dam Decommissioning Project

    scheduled dates for these meetings are as follows:- January 24, 2023- February 28, 2023- March 28, 2023- ... license and remove the four developments.12 On October 5, 2017, Commission staff requested additional ... at $450 million. Supporting documents, including the summary and most up-to-date reports are below.  ...

    03/28/2024 - 9:38am

  10. Housing Assistance Application

    Sep Oct Nov Dec edit-submitted-date-day Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 ... Jun Jul Aug Sep Oct Nov Dec edit-submitted-date-of-birth-day Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 ... 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 edit-submitted-eviction-date ...

    03/13/2024 - 3:13pm

Pages