Page not found

Search results

  1. Scott Valley Groundwater Advisory Committee Meeting

    Slides Meeting Slides Image Slideshow Display Contact Info Block Web Page Calendar Event Menu Settings ... Jones gage • Each month of 1991 – 2018: • January: range of average flow among 28 Januaries • February: ... , 1991-2018 – sorted early to late 41 Fall Reconnection Date, 1991-2018 – sorted early to late 2022-like ...

    12/06/2023 - 1:14pm

  2. Workshop on Efficient Water Management for Forage Crops

    Image Slideshow Display Contact Info Block Web Page Calendar Event Menu Settings Workshop on Efficient ... Survey 2018, (DWR-UCD) Approximately 30% decline in field crops between 2006 and 2017 and increase in ... AE=80% Max application depth=(0.4*1.2/.8)=0.60 in/day 80 acre field with just one zone, need to apply ...

    03/21/2024 - 3:43pm

  3. Archived Documents

    County: No entry. This field will auto-populate from the Information worksheet. Date: No entry. This field ... $7,239.47 24 47 Day Reporting Center NON-FSP $1,470.00 $1,470.00 25 $0.00 26 $0.00 27 $0.00 28 $0.00 29 ... field will auto-populate from the Information worksheet. Date: No entry. This field will auto-populate ...

    09/27/2023 - 11:50am

  4. JH Ranch Project

    150 µg/m3-- 150 µg/m3 30 µg/m3 50 µg/m3 Sulfates 24 Hour---- 25 µg/m3 Lead 30 Day Calendar Qtr-- 1.5 ... is attained when the expected number of days per calendar year with a 24-hour average concentration ... occupants (guests and staff) for single events that utilize temporary housing facilities, such as tents, in ...

    11/21/2023 - 4:23pm

  5. Klamath Dam Decommissioning Project

    scheduled dates for these meetings are as follows:- January 24, 2023- February 28, 2023- March 28, 2023- ... at $450 million. Supporting documents, including the summary and most up-to-date reports are below.  ... Siskiyou Board Meeting Dates Lower Klamath Hydroelectric Decommissioning Project *dates subject to change* ...

    03/05/2024 - 3:29pm

  6. State Inmate Early Release Program

    Your request must be post marked within 30 calendar days from the date you were served this decision ...

    02/09/2024 - 2:17pm

  7. Policy and Labor Contracts

    bi-weekly pay period, the anniversary date shall be adjusted to the first day of the present pay period or ... Service: The number of calendar days during which work was actually performed for Siskiyou County which has ... regulation by the Board of Supervisors. Day: A calendar day unless otherwise specified. Demotion: A reduction ...

    03/26/2024 - 2:48pm

  8. Klamath Dams

    socioeconomic impacts on the local community. See, e.g., PacifiCorp, 162 FERC ¶ 61,236 at ¶ 28 (Mar. 15, 2018 ... Plan”) (dated October 16, 2018) (Appendix B) • Draft Environmental Impact Report (EIR) for the Lower ... On April 06, 2016, two new agreements were signed to replace the Klamath Basin Restoration ...

    11/22/2023 - 3:27pm

  9. Planning Documents

    2018............................................... 13 Table 6: Existing STAGE Weekday Service ... Ridership.......................................................................................... 21 Table 9: FY 2018-19 STAGE Ridership by ... Year-to-Date............................................................. 26 Table 12: STAGE Operating Revenue ...

    02/05/2024 - 3:03pm

  10. RFP- Vehicle/Waste Removal and Disposal

    of Events Estimated Dates Activity 6-30-2023 Release of Request for Proposal (RFP) 7-7-2023 Mandatory ... awarded contractor shall furnish a performance bond within fifteen (15) calendar days of receipt of the ... day's delay in completing the work beyond the final completing dates specified above or as amended ...

    07/28/2023 - 4:05pm

Pages