Page not found

Search results

  1. Applications and Permits

    a flammable gas. Refer to SCC Sec.3-11.03.1,(ord.04-12) $0.00 FEES HAZARDOUS MATERIALS BUSINESS PLANS (HMBP) ... Penalties for late payments- all annual fees are due within 30 days of the billing date. A cumulative 10% of ... operation. Facilities operating 1 through 90 days 25% fee Facilities operating 11 through 180 days 50% fee ...

    10/19/2023 - 2:21pm

  2. Scott Valley Groundwater Advisory Committee Meeting

    Slides Meeting Slides Image Slideshow Display Contact Info Block Web Page Calendar Event Menu Settings ... 11Numerical Modeling …all models are wrong… …the ability to devise simple but evocative models is the ... at field-scale • Input data (text files) – Landuse – Soil properties – Irrigation type – Water source ...

    12/06/2023 - 1:14pm

  3. Workshop on Efficient Water Management for Forage Crops

    Image Slideshow Display Contact Info Block Web Page Calendar Event Menu Settings Workshop on Efficient ... Zaccaria, UC Davis) 11:15 – 12:00 pm: Evaluating Irrigation System Performance at Field Level: Criteria, ... Survey 2018, (DWR-UCD) Approximately 30% decline in field crops between 2006 and 2017 and increase in ...

    03/21/2024 - 3:43pm

  4. Aboveground Petroleum Storage

    Environmental Health\Misc Letters, Calendars, etc\List of environmental consultants.doc Baker Environmental 550 ... in the “Notice to Comply” in the attached CUPA Inspection Report must be corrected within 30 days of ... Department at the above address within 35 days of receipt of the Inspection Report. All disputes to any ...

    01/22/2024 - 10:09am

  5. Planning Commission Meeting

    Web Page Calendar Event Maps Menu Settings McMahon Zone Change (Z-23-05) and Boundary Line Adjustment ... (10) calendar days of today’s meeting (if the 10th day falls on a weekend, the appeal must be received ... Notations and Recommended Conditions of Approval Notations 1. Within ten (10) days following the date of the ...

    03/20/2024 - 10:36am

  6. State Inmate Early Release Program

    Your request must be post marked within 30 calendar days from the date you were served this decision ...

    02/09/2024 - 2:17pm

  7. Klamath Dam Decommissioning Project

    at $450 million. Supporting documents, including the summary and most up-to-date reports are below.  ... of Siskiyou Board Meeting Dates Lower Klamath Hydroelectric Decommissioning Project *dates subject to ... Attachment 8 – Schedule of Special Board Meeting Dates December 6, 2022, Staff Presentation Notes to Siskiyou ...

    05/01/2024 - 10:19am

  8. Archived Documents

    County: No entry. This field will auto-populate from the Information worksheet. Date: No entry. This field ... field will auto-populate from the Information worksheet. Date: No entry. This field will auto-populate ... navigate spreadsheet. County: No entry. This field will auto-populate from the Information worksheet. Date ...

    09/27/2023 - 11:50am

  9. Policy and Labor Contracts

    bi-weekly pay period, the anniversary date shall be adjusted to the first day of the present pay period or ... Service: The number of calendar days during which work was actually performed for Siskiyou County which has ... regulation by the Board of Supervisors. Day: A calendar day unless otherwise specified. Demotion: A reduction ...

    03/26/2024 - 2:48pm

  10. Land Use

    and place for response and an opportunity to be heard within 10 days of the date of mailing. (c) ... camp on the property in absence of a permitted dwelling unit for more than 30 days per year and ... occupancy of more than 30 days per year constitutes a violation of Siskiyou County Code Section 3-17.01. ...

    09/18/2023 - 10:04am

Pages